Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Deutsch |Pусский |
| No.13686543

- Product Categories
- Friendly Links
Information Name: | Jiangsu chimney tower new construction, security, efficiency, known for |
Published: | 2015-04-21 |
Validity: | 300 |
Specifications: | |
Quantity: | 100.00 |
Price Description: | |
Detailed Product Description: | Jinsheng altitude Engineering chimney tower undertake new construction, major projects: Sliding new towers, cooling tower sliding mode, the new water tower, a new umbrella water tower, a new cooling tower, cooling tower New, New inverted cone water tower, a new mushroom-shaped towers, New construction chimney towers and other related construction projects. The chimney tower new construction, the use of external derrick Sliding barrel construction, water recovery system in place for enhancing the overall installation; tank barrel, the Master channel, floor the gas tank, the tank and the tank roof waterproof powder, etc., are After further enhance the erection of the mast after mounting the tank construction. Within the platform ladder with slippery touch once installed. Tank external finishes in front of the tank upgrade ready. Flashlight use external finishes tank hanger construction is completed. How new chimney tower construction safety jobs: 1. tower construction, it will be classified as within the scope of the ground from the support tube 15m safe operating area, a non-operating officer shall not people. 2. When the water tower construction, erection of 1.8m long tube top wells lightning and grounding wire connected to the water tower. 3. basket racks, trays, covered with pockets full of safe operating platform safety nets, basket rack and secure platform to avoid concentration Heaping, construction loads must not exceed 150kg / m2. 4. tower construction, water tank in the promotion process, in order to prevent free-swinging under wind load effect can be hung in the tank evenly between the ring beam and support tube 8 hardwood wedges, small head-on, upside down, so that tank swing restriction minimized. When the tank ring beam guide rollers promoted to branch out of the barrel, the more tightly wedge should be provided to keep the tank stable, windless weather at the same time as we choose to complete this segment improved. In case of bad weather (high winds, such as six or more), should be suspended for improvement. 5. The last upgrade about 3m in front of the tank in place, the operation is not synchronized boom great cause uneven stress, so be sure to adhere to the beats, ground leveling, ground testing and adjusting, balancing improved. Jiangsu Jinsheng altitude Engineering Co. www.cnjsgk.com chimney tower New Project | Aerial landscaping corrosion engineering | altitude maintenance Demolition |
Admin>>>
You are the 4589 visitor
Copyright © GuangDong ICP No. 10089450, Jiangsu Jinsheng altitude Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 4589 visitor
Copyright © GuangDong ICP No. 10089450, Jiangsu Jinsheng altitude Engineering Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility